1. Application:
Aerial-hanging
Wall-mounting
2. Product Specifications
| Item | GPJM3-RS |
|---|---|
| Dimension (mm) | Φ190×435 |
| Weight (Kg) | 2.3 |
| Diameter of Cable (mm) | Φ7~Φ22 |
| Number of Cable Inlets/Outlets | Four |
| Number of Fibers per Tray | 24 (single core) |
| Max. Number of Trays | 4 |
| Max. Number of Fibers | 96 (single core) |
| Sealing of Inlet/Outlet Ports | Heat-shrinkable tube |
| Sealing of Shells | Silicon rubber |
3. Kit Contents
| Item | Type | Quantity |
|---|---|---|
| Fiber Optic Splice Sleeve | Allocated based on fiber count | |
| Buffer Tube | PVC | Allocated by trays (according to customer needs) |
| Nylon Ties | 4×trays | |
| Heat-shrinkable Tube | Φ32×200 | 4 PCS |
| Heat-shrinkable Tube | Φ70×250 | 1 PCS |
| Branch Fork | 1 PCS | |
| Marking Note | 4×fiber cores | |
| Hanging Tools | Aerial-hanging or wall-mounting | 1 pair |
| Plastic Hoop | 1 piece | |
| Plastic Wrench | 2 small and 1 large | |
| Seal Ring | 1 piece | |
| Sand Paper | 1 piece | |
| Aluminum Foil |
1 piece |
4. Installation Steps

1. Saw the entry ports as needed.
2 . Strip the cable as required for installation, and put the heat-shrinkable tube on.
3. Penetrate the stripped cable to the bracket through the entry ports, fix the strengthening wire of the cable on the bracket with the screwdriver.
4. Fix the fibers on the entry part of the splice tray with nylon ties.
5. Put the optical fiber on the splice tray after splicing and make a note.
6. Put the dust cap of the splice tray on.
7 . Sealing of the cable and the base: clean the entry ports and cable with a 10cm long scrubber.
8. Sand the cable and entry ports that need to be heat-shrunk with abrasive paper. Wipe the dust that is left after sanding away.
9 . Bound and even the heat-shrink part with aluminum paper to avoid burn caused by the high temperature of the blast burner.
10. Put the heat-shrinkable tube on the entry ports, then heat it using a blast burner and stop heating after it is tightened. Let it be cool naturally.
11 . Usage of branch folk: when heating the oval entry port, folking the heat-shrinkable tube to separate the two cables and heating it, follow the steps above.
12 . Sealing: use a clean scrubber to clean the base, the part to put the silicone rubber ring, and the silicone rubber ring, then put the silicone rubber ring on.
13. Put the barrel on the base.
14. Put on the clamp, run the Ferris wheel to fix the base and barrel.
15. When installing, fix the hanging hook as shown.
i.Aerial-hanging
ii. Wall-mounting